From: route@monster.com
Sent: Thursday, April 07, 2016 11:53 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Glenn E. Hoilman 150 Jarrett Rd. Bakersville, NC. 28705 (828) 467-8968 Cell (preferred) navyvet8192@gmail.com Summary: I am a seasoned nuclear
professional with over 14 years of line, support, and leadership experience
at the site and corporate levels. I am a multifaceted individual with a
desire to obtain a team position within your organization in a Work
Management Scheduler professional role. I desire a position that would
allow for utilization of my diverse skills to enhance the Project team.
A position where my experience and technical expertise, coupled with my
proven leadership abilities can be fully maximized. I desire to perform in a
position that would challenge me to my fullest potential, while offering
opportunities for professional growth. Specialties:
Project Scheduler, (P6, P3, MS Project, & Projectview) Project
Management, Project Controls, Craft Supervision, Department Management,
Technical Instructor, Curriculum Development, Corporate GOSP, Fukushima
Response, FLEX Strategy Implementation. Experience: Fukushima FLEX I/O Coordinator; Allied
Technical Services April 2014 – Present I am presently responsible for Electrical
and Instrumentation Fukushima Response FLEX Strategy modification
implementations for the Duke Energy McGuire Nuclear Station. Responsibilities
include representing the implementation team at the online T week, as well as
the outage organization meetings. I am acting as the interface between
Engineering, Work Management, and Maintenance implementing organizations. I
address and/or routing for disposition issues affecting the successful
implementation of identified modifications using the Corrective Action
Program, ensuring scheduled work activities are ready to execute or are
rescheduled to the appropriate work window. Successfully implemented NRC
Order EA-12-049 during 1EOC23 refueling outage, the 2nd plant in the US to
implement the Fukushima Response FLEX strategy order. Project Controls Scheduler; Granite
Services International December 2013 – March 2014 Responsible for GE turbine/centerline
project schedule development utilizing Microsoft Project and Primavera P6
suites for incorporation into the station's online and outage work schedules
at the Plant Hatch nuclear power plant, and resource man loading/cost
estimating utilizing Microsoft Excel and Access. Sr. Nuclear Scheduler; ASAP, Inc. May 2013 – November 2013 Responsible for Fukushima Recovery Program
Project Schedule Development for the Brunswick Nuclear Plant, utilizing the
Project View scheduling suite for incorporation into power station’s online
and outage work schedules. This includes resource man loading and cost
estimating utilizing Microsoft Excel and Access into the Brunswick tracking
systems. Programs Superintendent, Part 26/CAP; BWB
Nuclear Services January 2013 – April 2013 Responsible for oversight of administrative
personnel and programmatic control of the BWB 10CFR26.2xx Fatigue Management
Program and the site’s Corrective Action Coordinator at the Brunswick Nuclear
Plant. Responsibilities include screening potential violations
associated with unplanned schedule deviations for Part 26 covered
workers. Review BWB CAP condition report responses for issue correction
accuracy and proposed resolution effectiveness when implemented. Sr. P6 Scheduler; Curtiss Wright Flow
Control October 2012 – January 2013 Responsible for project schedule
development for the Ft. Calhoun Nuclear Plant Recovery/Restart Project utilizing
Primavera version 6 suite for incorporation into power station’s outage work
schedules. This includes resource man loading and cost estimating utilizing
Microsoft Excel and Access into the Ft. Calhoun tracking systems. Additional
responsibilities include project presentations to station management
utilizing Microsoft Power Point, Resource man loading and cost estimating
utilizing Microsoft Excel. Manager, Project Controls; Progress
Energy/Duke Energy (Duke acquired Progress 7/3/12) May 2012 – September 2012: Southport, NC. I was responsible for providing corporate
level Governance, Oversight, Support, and Procedural/Programmatic guidance of
contract Project Management personnel performing in all facets of Project
Controls at the Brunswick Nuclear Plant in Southport, NC. for the Nuclear
Plant Projects department. This includes cost analysis, audit and assessment
development/programmatic and procedural adherence, KPI development and
implementation, project execution. Supervisor,
Maintenance Programs; Progress Energy October 2010 – May 2012: Southport, NC. I was responsible for Maintenance
Department Programs Development, Implementation, and Oversight. Performing
Industry Assessments, Benchmarking, and Industry Peer reviews in the area of
Maintenance and Work Management. Additional responsibilities include
Metrology (Calibration) Lab Operations, Interfacing between Maintenance and
Scheduling Departments, (Online & Outage) Benchmarking Coordination. I
was promoted from Sr. Nuclear Scheduler within the Outage and Scheduling
Department at the Brunswick Plant. Sr. Scheduling Engineer II; Bechtel Power
Corporation June 2010 – October 2010 Responsible for project schedule
development utilizing Primavera P3/P3e (P6) suites for incorporation into power
station’s outage work schedules. This includes resource man loading and cost
estimating utilizing Microsoft Excel and Access into the Bechtel's tracking
processes. Additional responsibilities include project presentations to
station/Bechtel management utilizing Microsoft Power Point, Resource man
loading and cost estimating utilizing Microsoft Excel, Performance Indicator
(PI) development/work-off curve tracking utilizing Microsoft Excel,
Reporting/updating project status to station OCC personnel, and Condition
Report resolution utilizing Indus Passport. Sr. Project Scheduler; Shaw
Stone & Webster May 2009 – June 2010 Responsible for MSR project schedule
development utilizing Primavera P3/P3e (P6) suites for incorporation into the
station’s outage work schedule. This includes resource man loading and cost
estimating utilizing Microsoft Excel and Access into the Shaw Group’s
tracking processes. Additional responsibilities include project presentations
to station/Shaw senior management utilizing Microsoft Power Point, Resource
man loading and cost estimating utilizing Microsoft Excel, Performance
Indicator (PI) development/work-off curve tracking utilizing Microsoft Excel,
Reporting/updating project status to station OCC personnel, and Condition
Report resolution utilizing Indus Passport. Last assignment was with Entergy
Corporation, Palisades Nuclear Station. I was furloughed as part of a
Lack of Work layoff. Project Controls Schedule Analyst (Senior
Scheduler); Granite Services International July 2008 – May 2009 Responsible for GE turbine/centerline
project schedule development utilizing Microsoft Project and Primavera P3/P3e
(P6) suites for incorporation into the station's online and outage work
schedules, and resource man loading/cost estimating utilizing Microsoft Excel
and Access. Assignments were with Southern Co. Plants Vogtle & Hatch
Nuclear Station’s, and TVA Browns Ferry Nuclear Plant for their refueling
outages. I returned to work with the Shaw Group when my position
reopened. Project Lead Installation Representative;
Shaw Stone & Webster Co. February 2008 – May 2008 I was responsible for the Limerick
Generating Station Unit 2 Refuel Bridge Project installation. Manager,
Corporate Maintenance; Exelon January 2006 – August 2007 I was responsible for Corporate Maintenance
Department Governance, Oversight, Support, and Process Development (GOSP) for
the Exelon Fossil and Hydroelectric power fleet. Responsibilities include
providing station maintenance department manager’s goals and milestones for
performance, productivity, and schedule adherence reviews utilizing Primavera
P3 suite. I ensured station compliance with procedures and guidelines for the
effective performance of maintenance and OSHA compliance. Additional
responsibilities include station maintenance project management at 13
locations in 5 states. Promoted to this position from Sr. Production
Coordinator/Supervisor role at Peach Bottom Atomic Power Station, 5/21/07. Calibration Lab Supervisor; Florida Power
and Light April 2004 – January 2006 I was responsible for the overall
calibration lab operations at the St. Lucie Nuclear Plant in Jensen Beach
Florida. Duties included Fluke METCAL calibration process programming, lab
craft oversight, Plant Outage support, and contractor coordination. Education: Associates Degree Equivalency: U.S. Navy - State Technical Institute Memphis;
Millington, TN. Electronics Engineering Technology Equivalency (No formal
degree awarded) Industry Training: - INPO accredited Maintenance/I&C
Supervisor qualified through the National Academy for Nuclear Training - Primavera P3 Advanced Scheduler Training;
Philadelphia, PA. Completed: June 20, 2008 - P6 Certification May 2009 Current US Passport
|
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|